Figure 3–11: Repositioning Transition Board 1
CXO-2797A
TRANSITION
BOARD 1
(BEHIND FRAME)
SLOTTED
HOLE
SLOTTED
HOLE
HOLE FOR
TB1 RIGHT
POSITION
HOLE FOR
TB1 LEFT
POSITION
TRANSITION
BOARD 2
SCREWS
2. Remove the center screw from transition board 1.
3. Loosen the corner screws in the slotted holes of the board.
4. Slide transition board 1 to the left.
5. Install and tighten the center screw in the hole for TB1 left position as shown in
Figure 3–11.
6. Tighten the corner screws in the slots.
7. Replace the SA7x enclosure operator control panel by lining up the connectors and pushing
the operator control panel into the enclosure.
3.7.5 Routing the SA7x Enclosure Cables
Steps 1 through 9 of the following procedure details cable routing for the first SA7x enclosure
installed in the left side of the cabinet. Step 10 of this procedure details the cabling of the
second SA7x enclosure, installed in the right side of the cabinet. Route the SA7x enclosure
cables as follows:
1. Plug the female end of the SA7x enclosure power cord (17–00442–27) into the SA7x
enclosure.
Installing the SA70–CK Kit 3–19