6.5 Final Verification
6.5 Final Verification
Now that all the hardware installation, cabling and labeling, and the powering
up steps are complete, you are ready to configure the DSSI subsystem and
verify the correct operation of each ISE in the array with the host system.
Refer to the KFMSA Module Installation and User Manual (EK–KFMSA–
IM) for detailed information and how to proceed with verifying the correct
operation of each ISE which has been installed. In these manuals, you will
find the procedure for establishing the communications between the ISEs, the
adapter module, and the system. You will also find the step-by-step procedures
for reconfiguring the system with its newly installed DSSI devices.
Refer to the manuals for the disk ISE and tape ISE for detailed information on
the local programs in the ISEs.
Remember, each SF72 enclosure can contain two or four disk ISEs. Each
magazine tape subsystem contains one tape ISE. A fully configured
Sx300 storage array contains 24 disk ISEs or max. 4 tape ISEs in mixed
configurations.
If at any time you detect a failure, see Chapter 8.
Once the verification is complete mount the front bezel. The system is ready to
be turned over to the system manager.
Installing the Magazine Tape Subsystem in an Sx300 Storage Array 6–27